(1) Can the Minister please provide an update on the following projects under the Regional Roads and Transport Recovery Package?
• Betterment of Ross Lane, Lennox Head Flood Immunity
• Betterment of Mullumbimby Road
• Betterment of Wilsons Creek Road
• Betterment of flood immunity and pavement resilience along Yamba Road between Harwood Bridge and Palmers Channel, Palmers Island
• Betterment of Naughtons Gap Road
• Betterment of MR145 Woodburn Coraki Road
• Betterment of O'keefe Drive
• Betterment of Wisemans Ferry Road Embankment Stabilisation and Pavement Restoration
• Betterment of Deaves Road, Mandalong
• Betterment of Grieve Crossing Bridge across the Richmond River_Gradys Creek Road
• Betterment of Clarence Way Sandilands to Bonalbo
• Betterment of Strategic Causeways in Lismore LGA
• Betterment of Molesworth Street Bridge & Sewer Line, Tenterfield
• Betterment of Melville Ford timber bridge at Melville Ford Road (Maitland)
• Betterment of Lansdowne Road Pavement Upgrade
• Betterment of Old Maitland Road Hexham - Road Renewal
• Betterment of ARC Unsealed Rd Drainage
• Betterment of Glen Innes Severn Local Roads
• Betterment of Glen Innes Severn Regional Roads
• Betterment of Kalang Road
• Betterment of Darkwood, Timboon, Valery and Martells Roads
• Betterment of Dungay Creek Causeway
• Betterment of Nambucca Valley river crossings - raising for future flood immunity
• Betterment of Maria River Road
• Betterment of Stoney Creek/Pembrooke Road & Bridges
• Betterment of Tweed Shire causeways
• Betterment of River and floodway Crossings
• Betterment of Wybong Road, Muswellbrook Shire
• Betterment of Bell Street Bridge, Muswellbrook
• Betterment of Kilfoyles Bridge
• Betterment of Stanhope Road
• Betterment of Causeways across the Upper Hunter
• Betterment of stormwater drainage for 43 nominated road crossings
• Betterment of MR83 Summerland Way Seg2080 - 3300 - Amouring of Waterways
• Betterment of MR83 Summerland Way Seg3300 - 3750 - Armouring of Waterways
• Betterment of MR83 Summerland Way Seg3750 - 9110 - Armouring of Waterways
• Betterment of HW16 Bruxner Highway Seg 2710 - 2330 - Armouring of Waterways
• Betterment of MR83 Summerland Way Seg 3640 - 3670 - Harden Pavement
• Betterment of HW16 Bruxner Highway Seg 2940 - 2960 - Scour protection & Downslope stabilisation
• Betterment of HW12 Gwydir Highway Seg 1110 - 1520 Improve slope stability
• Betterment of HW10 Pacific Highway - Yamba Off-Ramp
• Betterment of SH10 Old Pacific Highway Seg 3020 - 3400 Mooney Mooney to Calga
• Betterment of HW16 Bruxner Highway Seg 5330 - 5400 - Improve batter drain & transverse culverts
• Betterment of MR83 Summerland Way Seg 8855 - 9110 - Improve slope stability
• Betterment of MR83 Summerland Way Seg 8350 - Scour protection & Downslope stabilisation
• Betterment of MR83 Summerland Way Seg 8776 - Rock fall fence
• "Betterment of HW16 Bruxner Highway Seg6005 - Scour Protection & Downslope Stabilisation"
• Betterment of MR692 Failford Rd Seg 550 - 560 - Raise road level and improve drainage
• Betterment of HW10 Pacific Highway Seg 80 to Seg 8010 and Seg 8110 New England Highway Hexham - Repair and upgrade transverse drainage
• Betterment of HW12 Gwydir Highway Seg4000 - 4050 - Improve Slope Stability
• Betterment of MR108 Nelson Bay Road Seg 510 - 540 from Frost Road to Gan Gan Road - Raise road level and improve drainage
• Betterment of MR76 Waterfall Way Seg1200 - 1420 - Improve Slope Stability
• Betterment of MR76 Waterfall Way Seg1400 - Improve Slope Stability
• Betterment of MR76 Waterfall Way Seg1180 Culvert 39 - Improve
• Betterment of HW27 Golden Highway Seg 38
• Betterment of MR503 Putty Road Seg 6780 - 6070
• Betterment of MR209 Denman Road Seg 209090 – 209140
(2) With reference to (1), can the Minister advise the start date on each of these projects?
(3) With reference to (1), can the Minister advise the expected completion date on each of these projects?