(1) Can the Minister advise, is Transport for NSW continuing to investigate increasing the Track Axel Load limit between Gilgandra and Dubbo to 25 Tonne Axle Load Limit (TAL)?
I am advised
Transport for NSW has engaged with the Rail Infrastructure Manager, UGL Linx.