5100 - HAMPDEN BRIDGE – KANGAROO VALLEY

Ward, Gareth to the Minister for Roads, and Minister for Regional Transport
HAMPDEN BRIDGE – KANGAROO VALLEY

With respect to the Government’s recent decision to reduce the load limit from 42.5 to 23 tonnes by 30 May 2025:

(1) Why did you decide to reduce the load limit on Hampden Bridge?

(2) Was there any report or review affecting this decision and, if so, can you provide it?

(3) What consultation did you undertake before making this decision?

(4) Do you plan to pause the proposed reduction to consider any feedback and impacts on primary producers, small business, council and residents?

(5) Are there local exemptions for vehicles over 23 tonnes, like the current provisions for emergency services?

(a) If not, would the Government consider this?

(6) Can you outline the “regular maintenance” that is to continue whilst you explore a long-term solution that balances the protection of the heritage bridge and the interest of all road users?

Answer -

I am advised:

(1 - 2) After thorough structural engineering assessments and testing, Transport for NSW advised of the need to reduce the load limit to 23 tonnes. These evaluations are conducted by experienced, qualified structural engineers.

(3) The decision to reduce the bridge’s load limit was based on consultation with and expert advice from structural engineers, following detailed testing and risk assessments.

(4) The reduction in the load limit has been deferred by one month, in conjunction with a reduction in the speed limit on the bridge, to provide impacted heavy vehicle operators more time to plan their route changes, while ensuring the safety of motorists and the bridge’s structural integrity.

(5) Exemptions will be in place for emergency vehicles.

(6) Regular inspections and maintenance of the bridge will continue. Over the coming months, Transport for NSW will repair or replace damaged sections of the bridge. The community will be informed in advance of any work. This maintenance will not alter the look and feel of the bridge or affect its heritage value.


Question asked on 8 May 2025 (session 58-1) and printed in Questions & Answers Paper No. 108
Answer received on 12 June 2025 and printed in Questions & Answers Paper No. 118